Skip to content
Toggle Navigation
About
Overview
Leadership
In-House Engineering & Design
Interspan Europe Strengthening & Repair Division
Why Partner with Interspan?
Quality Assurance
Capability Statements
New Structures
The Post-Tensioning Method
Specialist Slab Post-Tensioning
Construction methodology
Lifting and Jacking Works
Multi-Strand Tensioning Systems
Stress Bar Post-Tensioning
Sustainability and Carbon Emissions
Existing Structures
Crack Injection
CFRP Strengthening
Structural Concrete Repair
External Post-Tensioning
Bearings and Expansion Joints
Forensic Investigations
Tendon Trucations
Remedial Grouting
Heavy Lifting & Monitoring
Cathodic Protection
Civil & Infrastructure Division
Projects
News
Contact
Search for:
News
Thinner Slabs – Smarter Structure
Continue reading
Interspan is now B1 (F50) Prequalified with Transport for NSW
Continue reading
Recognising Emerging Talent
Continue reading
Interspan CARES Audit
Continue reading
Pierre-yves Souesme, National Infrastructure Manager
Continue reading
Interspan Europe Launches Strengthening & Repair Division
Continue reading
Choosing the Right Post-Tensioning Subcontractor
Continue reading
Post-tensioning for Veriu Macquarie Park
Continue reading
Interspan Group at London Build 2024
Continue reading
PTA Retrofit Project of the Year Award – Construct 2024
Continue reading
1
2
Next
Page load link
Go to Top