
Construction methodology
Innovative construction methodologies enable works to be completed outside the critical path in a safe and controlled environment. This approach reduces project costs and schedules, improves safety, and minimises disruption.
At Interspan, we bring together the expertise of our in-house design team, method engineers, and specialist civil works professionals to deliver comprehensive construction methodologies that address project-specific challenges while optimising safety, cost, and constructability.
The Interspan Solution includes:
- Innovative bridge installation methods, such as heavy lifting, strand jacking, and incremental launching.
- Tailored temporary works design, including shoring, propping, and temporary support systems, engineered to project requirements.
- Integration of specialist techniques such as post-tensioning and precision grouting, enabling modular design, efficient assembly, and reduced traffic disruption.
Our services include:
- Construction methodology
- Temporary works design
- Temporary works fabrication
- Specialist equipment supply
- Erection and installation of structures and elements.




