
Interspan (NSW) is currently working with the Built/Obayashi JV (BOJV) on Parramatta Square Tower 4.
The scope of works includes the design, supply and installation of post-tensioning systems to 92,000m2 of concrete floors and a multistrand tie system to support the use of inclined ‘V’ columns over 3 levels.





