Innovative Heavy Lifting for ACT Bridge
Completed in 1895, Tharwa Bridge is the oldest bridge in the Australian Capital Territory and the oldest surviving Allan Truss bridge in Australia.
Extensive strengthening works were undertaken in 2008, including the replacement of original truss members.
To facilitate these works, the bridge deck was supported by a temporary underslung steel-beam assembly spanning beneath the four truss spans — each over 27 metres in length.
Interspan’s Role
Interspan proposed and executed a bespoke heavy-lifting methodology to install and dismantle the temporary underslung steel-beam system.
The innovative strand-lifting solution provided a cost-effective and efficient approach while ensuring the preservation of the bridge’s heritage fabric and structural integrity throughout the process.
Interspan’s precision lifting methodology enabled safe and controlled works on one of Australia’s most historically significant bridges — combining modern engineering with the careful preservation of heritage infrastructure.
Read more about Interspan’s Lifting and Jacking
Project Details
General contractor: Arenco
Customer/Owner: Territory & Municipal Services (ACT Roads)
Work Period: 2008
Solution: Heavy Lifting
GLOBAL LEADER IN SPECIALISED CONSTRUCTION SERVICES
Interspan delivers efficient, durable and sustainable solutions across bridges, tanks, buildings, ports and energy infrastructure — helping clients optimise structural performance, reduce costs, and lower embodied carbon in construction.
Our expertise spans post-tensioning, structural strengthening and specialised concrete technologies, applied across both new and existing structures.
By integrating engineering design, construction methodology and material efficiency, we deliver technically robust outcomes that enhance safety, service life and overall project value.